The Gas turbine equipment GTU-16P has been designed on the basis of the gas generator of the high performance PS-90 aircraft engine and GTU-12P. The set has higher cycle parameters (application of 14-stage compressor) and has a power turbine adapted to the existing GPA.
The set is applied in the GPA -16 Ural modular gas pumping station manufactured by `Iskra`, and for the reconstruction of the existing gas pumping units, such as GTK-10, GPA-C-16, `Coberra-182`, GPA-10 and some others.
The equipment offered by us, has:
- high efficiency
- low lube oil consumption
- high life
- reliable air startup
- low maintenance cost for all life cycle
- complete automation of processes, simplicity of control and operation
- complete factory readiness, minimum expenses and fast commissioning
- good ecological parameters.