Gas turbine equipment GTU-12P has been designed on the basis of the gas generator of the high performance PS-90А aircraft engine. The turbine is applied in the GPA -12 Ural modular-component gas pumping set manufactured by `Iskra`, and to reconstruct the existing gas pumping sets, such as GTK-10, GPA-C-16, `Coberra-182`, STD-12500 and some others.
The equipment offered by us, has:
- high efficiency
- low lube oil consumption
- high life
- reliable air startup
- low maintenance cost for all life cycle
- complete automation of processes, simplicity of control and operation
- complete factory readiness, minimum expenses and fast commissioning
- good ecological parameters.